top of page
Bletchley rail depot
Project: Bletchley rail depot
Principal Contractor, and Simms client: Taylor Woodrow
Value - £3.15m. 2023 & 2024
Civils package to construct new track & 3mm tolerance jack slabs, turntables, slabs, pits
200m of sheet piling and double frames
5000m3 of Excavation & 275 no pile crop
3500m3 concrete (70% GGBS)
500t reinforcement
Drainage, ducting.
Completed within building, and to a very challenging programme with extremely constrained logistics.
140m long Road 4 pit, 40m long Road 1, 2 and 3 pits. General slab size 50m by 30m. General depth – 2m.
bottom of page